The city of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is intended to replace the old facility and will be situated within the current outdoor swimming infrastructure. By combining indoor and
Tender closed on 18 Nov 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In construction, DBENDORF CITY DEPARTMENT OF URBAN PLANNING has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The City of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is intended to replace the existing facilities and will be integrated with the current outdoor swimming infrastructure. The combination
The City of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is planned as a replacement and will be situated within the existing outdoor pool infrastructure. By combining indoor and outdoor swimmi
Replacement of aging chiller equipment for MRI-PET scanner systems in a medical imaging facility.
Refurbishment and internal alteration works to create expanded nursery and pre-school facilities at Broadlea Primary School on the Isle of Wight.
Painting and coating services contract for a national biorrefinery pilot plant facility, requiring industrial painting expertise and specialized surface treatment capabilities.
Caerphilly County Borough Council seeks an experienced principal contractor to strengthen Penallta Road Bridge using reinforced concrete box construction and permanent masonry cladding.