BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsConstruction of a New Indoor Swimming Pool in Dübendorf
    Closed contract

    Construction of a New Indoor Swimming Pool in Dübendorf

    Tender closed
    22 Sept 2025
    13 months ago

    The City of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is intended to replace the existing facilities and will be integrated with the current outdoor swimming infrastructure. The combination

    🇨🇭SwitzerlandPublished 13 Aug 2025· 1 years agoviaTED
    Tender closed
    22 Sept 2025
    13 months ago
    Tender deadline passed on 22 Sept 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      22 Sept 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇨🇭Switzerland

    Lifecycle

    Closed

    Tender closed on 22 Sept 2025. Awaiting award.

    13 Aug 2025Today22 Sept 2025

    Brief

    The City of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is intended to replace the existing facilities and will be integrated with the current outdoor swimming infrastructure. The combination of indoor and outdoor facilities at one location aims to create an attractive offering that benefits the local community. The new indoor pool will provide sufficient capacity for swimming lessons and sports for schools and clubs in the long term. By integrating both indoor and outdoor pools, operational and technical advantages can be leveraged, allowing for more economical management of both facilities. The project aims to utilize synergies with the existing outdoor pool wherever feasible. However, the outdoor pool is not part of this planning; the new construction will only affect existing buildings and swimming areas to a limited extent. The energy concept is designed to be highly ecological and economical. The objectives for the building and pool technology include: - Setting a benchmark for public sector projects (Energiestadt Dübendorf) - Environmentally and economically sensible heat generation - Efficient ventilation units, pumps, etc. - A project with exemplary economic performance and low life-cycle costs - Aiming for Minergie-P and Minergie standards for the indoor pool, although certification is not pursued.

    Track record

    2 awards · 2 winners
    Thin record

    Only 2 prior awards here — too little to read.

    In construction, DBENDORF CITY DEPARTMENT OF URBAN PLANNING has awarded 2 contracts to 2 suppliers.

    Who wins here
    1. DELANDOLT CO AG CONSTRUCTION COMPANY1× · 50%
    2. DE_Landolt + Co AG Bauunternehmung1× · 50%

    Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

    More from DBENDORF CITY DEPARTMENT OF URBAN PLANNING

    2 listingsView all →
    Construction🇨🇭Switzerland

    Construction of a New Indoor Swimming Pool in Dübendorf

    The city of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is intended to replace the old facility and will be situated within the current outdoor swimming infrastructure. By combining indoor and

    DBENDORF CITY DEPARTMENT OF URBAN PLANNING
    Published 9 Oct 2025
    AwardedConstruction🇨🇭Switzerland

    Demolition Work for New Indoor Swimming Pool in Dübendorf

    The City of Dübendorf is constructing a new indoor swimming pool at the existing outdoor pool site located at Oberdorfstrasse 23, 8600 Dübendorf. This new building is planned as a replacement and will be situated within the existing outdoor pool infrastructure. By combining indoor and outdoor swimmi

    CHF 195,722DBENDORF CITY DEPARTMENT OF URBAN PLANNING
    Published 13 Aug 2025

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    MRI-PET Scanner Chiller System Replacement

    Replacement of aging chiller equipment for MRI-PET scanner systems in a medical imaging facility.

    est.£20,000MANCHESTER UNIVERSITY NHS FOUNDATION TRUST
    Published 5 Oct 2026
    Construction🇬🇧United Kingdom

    School-Based Nursery Refurbishment Works at Broadlea Primary School, Isle of Wight

    Refurbishment and internal alteration works to create expanded nursery and pre-school facilities at Broadlea Primary School on the Isle of Wight.

    est.£147,550ISLE OF WIGHT COUNCIL
    Published 5 Oct 2026
    Construction🇮🇪Ireland

    National Biorrefinery Pilot Plant Painting Services

    Painting and coating services contract for a national biorrefinery pilot plant facility, requiring industrial painting expertise and specialized surface treatment capabilities.

    est.€110,000TIPPERARY COUNTY COUNCIL
    Published 5 Oct 2026
    Construction🇬🇧United Kingdom

    Penallta Road Bridge Strengthening Project

    Caerphilly County Borough Council seeks an experienced principal contractor to strengthen Penallta Road Bridge using reinforced concrete box construction and permanent masonry cladding.

    est.£600,000Caerphilly County Borough Council
    Published 5 Oct 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    534551-2025
    DC
    Buyer
    DBENDORF CITY DEPARTMENT OF URBAN PLANNING
    Sector
    Construction