The project involves extensive construction works for a new building, specifically the construction of a chamber building. Key tasks include: - Setting up the construction site with 1 sanitary container and 2 accommodation containers. - Establishing a construction power connection with 10 power di
Contract awarded. Originally published 7 months ago.
This contract involves the demolition of existing concrete surfaces and the underlying asphalt layers, as well as the removal of gravel and sand mixtures. The work includes processing these materials. The concrete slabs are approximately 24 cm thick, the asphalt layers are about 9 cm thick, and the
This contract involves the construction of a trapezoidal sheet metal roof and facade work using aluminum materials. The project includes the installation of approximately 900 square meters of steel trapezoidal sheet profiles, 900 square meters of compressible thermal insulation, and 2500 square mete
This contract involves the energy-efficient renovation of an office and accommodation building with a total area of approximately 3,000 square meters. The project includes the installation of around 600 square meters of drywall partitions, complete with door openings and wall connections, as well as
This contract involves the construction of a new chamber building. The building is designed as a standalone, single-story structure without a basement. It will have a height of less than 7 meters and more than two usage units totaling over 400 square meters, classifying it as Building Class 3 accord
Mercy College Beaumont is seeking contractors for heating system replacement, electrical upgrades, and new bike shelter installation as part of a 2026 climate action project.
Coolmine Community School in Ireland is accepting tender submissions for the supply and installation of a sports hall floor.
Emergency mechanical engineering works to upgrade heating (converting to LPG) and water services systems at a school in Ireland.
Tender for fire safety remedial construction works to stairwells and corridors at Kare McMahon Centre, Kilcullen, Ireland, with completion required by December 2026.