This public procurement contract is divided into two parts, each involving framework agreements with multiple suppliers (with the possibility of reopening the competition). The contracting authority anticipates entering into a framework agreement with a maximum of three suppliers for both parts of t
Contract awarded. Originally published 11 months ago.
No single supplier dominates the field.
In engineering, PRAGUE PUBLIC TRANSIT COMPANY JOINT STOCK COMPANY has awarded 5 contracts to 5 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This public procurement contract involves the supply of concrete mixtures and concrete pumps. The buyer, Dopravní podnik hl. m. Prahy, akciová společnost, is seeking suppliers who can provide high-quality concrete and reliable pumping services for construction projects. The total value of the contra
This public procurement contract involves the construction of a new tram line measuring 1.3 kilometers, starting from Bělohorské Street and extending along Vaníčková Street to the university dormitories and the final stop at Stadion Strahov. The project includes a complete reconstruction of Bělohors
This public procurement contract aims to ensure the proper and flawless operation of the electric fire alarm system (EPS). The contract is divided into several parts as per § 101 ZZVZ: Part 1 – Inspections, service, revisions, maintenance, and repairs of EPS in facilities managed by TSO. This includ
This public procurement contract involves the regular maintenance and repair of the TWS 30 tunnel cleaning machine and two tunnel washing units. Detailed specifications of the contract are provided in the mandatory contract proposal, which is included as Annex 2 of the tender documentation.
Electrical infrastructure upgrade project for hospital outpatient department including new distribution board, complete rewiring, lighting systems, and data point installation.
Open tender for roller shutter maintenance services at St Edmunds College, University of Cambridge, with submissions closing 28th September at 12 noon.
Experienced AV Hardware Integrator needed to design and implement audiovisual systems across four galleries at the Natural History Museum's Western Galleries renovation project.
Full rehabilitation contract for Archdeacon Duggan Bridge in Kinsale, Cork, including surface replacement, waterproofing reinstatement, and structural concrete repairs.