This contract involves the procurement of vehicle parts and consumables for the needs of the Water Supply and Sewerage Company in Burgas, Bulgaria, for a duration of three years. The procurement is divided into three categories: Category 1 - Supply of parts for passenger cars; Category 2 - Supply of
Tender closed on 6 Oct 2025. Awaiting award.
This contract opportunity involves the procurement of spare parts, consumables, replacement and measuring modules, and laboratory tests for laboratory equipment and measuring instruments from the brand 'Hach Lange'. Additionally, it includes service support, which encompasses repair, inspection, pre
This contract is part of Activity 4 of Project No. BG16FFPR002-1.001-0006 "Integrated Water Project for Burgas Region - Phase 2", funded by the "Environment Program 2021-2027", co-financed by the European Union. It involves upgrading the SCADA system and developing a Geographic Information System (G
This contract involves conducting archaeological monitoring and preliminary full rescue excavations along the routes of infrastructure projects in Bulgaria. There are three specific positions available: 1) Archaeological monitoring and preliminary full rescue excavations for the project 'Reconstruct
This contract involves engineering services for the construction of wastewater treatment facilities in Bulgaria, specifically for two designated positions: Position 1 – Engineering for the construction of a wastewater treatment facility at the "Kamchia" wastewater treatment plant; Position 2 – Engin
Thames Water is seeking an experienced supplier to design, install, and operate two solar PV plants with capacities up to 1,000kWAC and 450kWAC at Little Marlow and Maidenhead sites.
PfH is seeking qualified suppliers to provide building and construction materials through a four-year national framework agreement serving UK social housing organisations.
DCC seeks suppliers for four independent energy and metering service contracts spanning electricity, gas, biomethane, and metering operations through March 2032.
BGS seeks a qualified marine coring vessel and crew to conduct 30-day scientific drilling operations in the North Sea during April-May 2027 to collect paleoclimate records from sediment cores.