The city of Burghausen is planning a comprehensive renovation of parts of the existing indoor swimming pool, which was built in 1970 and expanded in 2003 with a wellness area including a sauna. The current renovation will focus on modernizing the original swimming pool facilities from 1970. The reno
Tender closed on 8 Oct 2025. Awaiting award.
The city of Burghausen is planning the renovation and revitalization of the Hans-Stethaimer School, including structural and fire safety improvements. The school complex consists of several parts built at different times, with the main building dating back to 1929/30, which integrates historical ele
The city of Burghausen plans to comprehensively renovate parts of the existing indoor swimming pool. The Burghausen swimming pool was built in 1970 and expanded in 2003 with a recreational area including a sauna. The current renovation will involve extensive modernization of the original swimming po
The Burghauser Wohnbau GmbH is acting as the representative for the City of Burghausen to construct four new subsidized multi-family houses using wooden hybrid construction on Paul-Klee-Straße. All buildings aim to achieve the DGNB Gold certification. Each of the four nearly identical three-story ho
Comprehensive refurbishment of a 12-span prestressed concrete bridge at Castletownbere Fishery Harbour Centre, including deck, pavement, structural, and safety system replacements.
Experienced contractors needed for lime re-pointing conservation work on 3 stone properties at Warslow Moors Estate farms.
Royal Parks seeks a Conservation Architect to conduct condition surveys, provide emergency conservation advice, and deliver full architectural services for heritage assets.
Procurement for professional installation services of an ICP Etch Tool with full commissioning and testing.