This contract involves the design and implementation of a new Central Dynamic Passenger Information System (CSDIP) and a Video Monitoring System (SMW) at Częstochowa Station, as part of the project to upgrade passenger service infrastructure at stations and stops. Key tasks include: 1) Creating nece
Tender closed on 5 Sept 2025. Awaiting award.
This contract involves the design and execution of construction work for the single-track railway line No. 236 between Wągrowiec and Rogoźno Wlkp., covering the section from km 77.913 to km 95.460. The scope of work includes: 1) preparing project documentation necessary for the proper execution of a
This contract involves the design and construction of a double-track railway line No. 8, specifically from km 196.095 to km 218.129. The scope of work includes: 1) Preparation of project documentation, including construction plans and necessary administrative approvals; 2) Execution of all construct
This contract involves the design and execution of construction work on Railway Line No. 68, specifically the section from Stalowa Wola Rozwadów to Przeworsk. The project includes two main tasks: 1) Task 1: Development of project documentation and execution of construction work on the section from G
This contract involves the management and supervision of construction work for the railway project "Works on the C–E 20 Railway Line from Skierniewice to Czachówek Wschodni." The primary scope includes overseeing the design and execution of works on railway line No. 12 from Skierniewice to Mszczonów
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.