This project involves the study for the construction of a bridge on Provincial Road 23, which serves as a bypass for Provincial Road 21 on the island of Lemnos. The bridge will allow the road to cross over the Avlona watercourse, located in the Avlona beach area, approximately 2.5 km north of Myrina
Contract awarded. Originally published 1 years ago.
Only 2 prior awards here — too little to read.
In engineering, NORTH AEGEAN REGION has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.
Supply and install Flexipave footpath and dropped kerbs at Tarka Leisure Centre to specification.