This project involves the construction of Phase A of the Kalloni – Petra road axis, starting from the junction of the 36th National Road of Mytilene – Kalloni with the 11th Provincial Road towards Ag. Paraskevi – Napi (measuring point 0+000) and ending at the junction of the 8th Provincial Road of S
Tender closed on 9 Sept 2025. Awaiting award.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.
Supply and install Flexipave footpath and dropped kerbs at Tarka Leisure Centre to specification.