Floating Structures Project in Bulgaria
This contract involves the design, construction, and delivery of a floating platform and photovoltaic installation. It is part of the Romanian-Bulgarian Cooperation for a Green Fit Danube System project, which aims to create a pilot system for monitoring, prevention, and response to river pollution.
Decision brief
4 fields- Contract valueest.BGN 685,613BGN
- Tender closed23 Sept 202510 months ago
- SectorBrowse related listings
- LocationBulgaria
Lifecycle
ClosedTender closed on 23 Sept 2025. Awaiting award.
Brief
More from EXECUTIVE AGENCY "MARITIME ADMINISTRATION"
Design and Delivery of Electric-Powered Boat for River Pollution Monitoring
This contract involves the design, construction, and delivery of a hybrid-powered boat equipped with both electric and emergency gasoline outboard engines. The project is part of the Romanian-Bulgarian Cooperation for a Green Danube System, aimed at enhancing environmental protection, biodiversity,
Emergency Safety Services in Bulgaria
This public procurement contract seeks suppliers capable of providing emergency response services related to maritime incidents. The services include urgent rescue operations to prevent, limit, and eliminate hazards arising from damage, accidents, or other maritime incidents involving vessels with a
Supply and Installation of Monitoring Systems in Bulgaria
The GREEN FIT FOR DANUBE project aims to enhance control over the inland waterways of Romania and Bulgaria, fostering cooperation and joint solutions for environmental protection. This contract involves: 1. The supply, installation, testing, and commissioning of a sensor-equipped floating technical
Fire Safety and Rescue Equipment for Maritime Administration
This procurement contract involves the technical servicing and repair of emergency rescue and fire-fighting equipment for the rescue boats owned by the Maritime Administration Executive Agency. The work includes inspection, replacement, and delivery of necessary equipment over a period of 12 months.
Open in Construction
Energy Efficiency Upgrades for Unit 1I at Scioból na bhFear, Gaoth Dobhair
Comprehensive energy efficiency and accessibility upgrade project for Unit 1I at Scioból na bhFear featuring new stairway, accessible facilities, and mechanical system improvements.
Heating and Ventilation Services for Spideal Language Commissioner Building - Unit 2
Heating and ventilation system replacement and ductwork modifications for a Gaeltacht regional authority office building in County Galway.
Waste Clearance Contract - Bolton House Road, Wigan
Urgent contract to remove 18,000 tonnes of illegally deposited waste from Bolton House Road, Bickershaw, with a compressed 15-day tender timeline due to public health and fire safety risks.
Divis Peatland Restoration Phase 2 - National Trust Northern Ireland
National Trust Northern Ireland seeks suppliers for Phase 2 of the Divis Peatland Restoration Project through the Proactis Plaza portal, with bids due 31st August 2026.