The contracting authority intends to replace the Otlerstraße bicycle bridge, which was destroyed during the Ahr flood in 2021. This procurement procedure involves the general planning services required for the new construction, including architectural planning for civil engineering structures (phase
Tender closed on 9 Sept 2025. Awaiting award.
No single supplier dominates the field.
In engineering, CONSTRUCTION AND DEVELOPMENT COMPANY BAD NEUENAHRAHRWEILER LTD has awarded 5 contracts to 5 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
The project involves the construction of a new fire station for the Ahrweiler Volunteer Fire Department, located on Ramersbacher Straße. The existing building was severely damaged by flooding in 2021 and is no longer repairable. A new facility with 12 parking spaces will be built south of the Ahr Ri
This project involves the construction of a new four-group kindergarten (Kita) to replace the St. Pius kindergarten, which was destroyed during the Ahr flood in 2021. The new building will be a two-story structure built with solid materials, covering an area of approximately 3,220 m², with a net usa
This project involves the construction of a new kindergarten to replace the Blandine-Merten-Haus, which was destroyed during the 2021 Ahr flood. The new building will be a two-story structure with solid construction and a partially wooden facade, situated on a plot of approximately 4,465 m². It will
This contract involves the construction of a new four-group kindergarten (Kita) to replace the St. Pius kindergarten, which was destroyed during the Ahr flood in 2021. The project includes a two-story solid construction building with an area of approximately 3,220 m² and a net usable space of around
NICTS seeks a property management supplier for Laganside Courts in Belfast, with a contract value of £300,000 per year for 2 years, extendable up to 8 years, covering maintenance, repairs, and on-site operatives.
Secondary school construction project for science lab upgrades and building-wide insulation improvements at Glanmire Community College, Ireland.
Contractors sought to complete a 4-week mechanical, electrical, and general refurbishment upgrade of Ardglass parish church, commencing September 2026 under PEACEPLUS funding.
Single-party framework contract for fire-stopping and fire-prevention services to seal structural gaps and prevent fire spread across compartments in Irish buildings.