The 'Pottacker' development area was included in the state program for Cooperative Land Development in 2023. The planning area is intended to be primarily developed for residential purposes as part of the 'Climate Quarter.NRW' initiative. The planning goal is to achieve a sustainable development tha
Contract awarded. Originally published 12 months ago.
The project area, Gewerbegebiet-Nord, covers approximately 100 hectares and is divided into two construction phases: the first phase is about 43 hectares, and the second phase is about 47 hectares, located in the northern part of Elsdorf. The currently agricultural land is set to be developed into a
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026 on a 38-hectare site that was previously a racetrack. As part of this project, the currently unused "Hammfeldhof" building complex, which dates back to 1968 and includes a residential building and two former stable bu
The city of Neuss is developing a public park on a 38-hectare site that was previously a racetrack, in preparation for the Landesgartenschau Neuss 2026. This project involves renovating and converting the currently unused "Hammfeldhof" building complex, which includes a residential building and two
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026 on a 38-hectare site that was previously a racetrack. As part of this project, the currently unused Hammfeldhof building complex, which dates back to 1968 and includes a residential building and two former stable buil
Construction tender for locker room refurbishment and associated works at Collins Barracks Cork, requiring online registration and zipped file submissions.
Join a dynamic framework connecting qualified waste and skip hire suppliers with public sector organisations across Wales.
Dudley MBC seeks a contractor to provide responsive drainage maintenance, repairs, and surveys for its housing stock with tiered response times from routine to emergency services.
Energy efficiency improvement project combining attic and cavity wall insulation upgrades at a County Mayo primary school under the 2025 CASWS programme.