The project area, Gewerbegebiet-Nord, covers approximately 100 hectares and is divided into two construction phases: the first phase is about 43 hectares, and the second phase is about 47 hectares, located in the northern part of Elsdorf. The currently agricultural land is set to be developed into a
Tender closed on 27 Mar 2026. Awaiting award.
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026 on a 38-hectare site that was previously a racetrack. As part of this project, the currently unused "Hammfeldhof" building complex, which dates back to 1968 and includes a residential building and two former stable bu
The city of Neuss is developing a public park on a 38-hectare site that was previously a racetrack, in preparation for the Landesgartenschau Neuss 2026. This project involves renovating and converting the currently unused "Hammfeldhof" building complex, which includes a residential building and two
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026 on a 38-hectare site that was previously a racetrack. As part of this project, the currently unused Hammfeldhof building complex, which dates back to 1968 and includes a residential building and two former stable buil
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026, managed by Landesgartenschau Neuss 2026 GmbH. This project involves renovating the currently unused Hammfeldhof building complex, which includes a residential building and two former stable buildings, originally cons
Topographical and utility survey services required to support detailed design of the Mountmellick Flood Relief Scheme project.
Confidential waste destruction and disposal services for the GMC's sensitive materials and documents, requiring compliance with strict information security policies.
The EPA is seeking a contractor to conduct independent air emissions monitoring at licensed industrial sites in Ireland from 2027-2029 to verify operator compliance and maintain environmental standards.
Design and develop a nature-based solutions catchment management plan for the Hollyford area to reduce flood risk, improve water quality, and provide implementation guidance with cost-benefit analysis.