This contract is for a framework agreement lasting 24 months for the collection, handling, transportation, and final disposal of hospital waste at the Pitesti County Emergency Hospital. Suppliers can request clarifications up to 18 days before the bid submission deadline, as per Article 160 of Law 9
Tender closed on 9 Sept 2025. Awaiting award.
This contract opportunity involves the supply of low and medium voltage electricity services, totaling 1700MW. It includes the contracting of transportation and distribution services as detailed in the specifications document. Suppliers have 18 days to request clarifications before the deadline for
This contract involves the supply of medicines as specified in the requirements document. The maximum value of each subsequent contract for each lot is detailed in the LOT LIST, along with the minimum value within the estimated range excluding VAT for each LOT. The participation guarantee is set at
This contract involves the supply of medicines according to the specifications outlined in the tender documents. The maximum value of each subsequent contract for each lot is specified in the LOTS LIST, along with the minimum value within the estimated range excluding VAT for each LOT. The participa
This contract opportunity involves the supply of medical consumables. The details regarding the maximum value of each subsequent contract for each lot can be found in the specifications document, which also outlines the minimum value within the estimated range for each lot, excluding VAT. The partic
Service provider needed to develop an Integrated Source Protection Plan for a group water scheme to protect drinking water sources from contamination.
Develop an Integrated Source Protection Plan to safeguard drinking water sources for Killeen Group Water Scheme's catchment areas.
NHS Trusts are seeking qualified occupational hygiene service providers to support workplace health, safety assessments, and regulatory compliance.
Develop a model to estimate where UK agricultural production would be displaced and assess the resulting environmental impacts of relocating that production overseas.