This contract opportunity involves the supply of brand new mini wheel loaders with side control, including necessary attachments. The loaders must be from the year 2025. The procurement is being conducted in parts, allowing for flexibility in delivery. Interested suppliers should refer to the provid
Tender closed on 18 Aug 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In manufacturing, ROAD REPAIR AND MAINTENANCE PLANT has awarded 2 contracts to 2 suppliers.
Across manufacturing, the most active winners are GRENEVIA S A, SANDROCK CZ SRO, KOMPAN LIMITED — the field to beat, or your route in as a partner.
This contract involves the delivery of two brand new backhoe loaders, manufactured in 2025. The procurement is divided into two parts: Part 1 involves the delivery of one backhoe loader, and Part 2 involves the delivery of another backhoe loader. The deliveries must comply with the specifications ou
This framework agreement involves the ongoing procurement of mineral-asphalt mixtures throughout 2026 for construction work in the city of Warsaw. The specific types and quantities of mixtures required are detailed in the attached document (Annex 1 to the procurement notice). Deliveries must comply
This contract involves the delivery of three brand new four-axle trucks with a maximum weight of 34 tons, produced in 2025. The procurement is divided into three parts, each requiring the supply of one new truck. Suppliers must adhere to the specifications outlined in the attached documents. The tru
This contract involves the supply of a brand new truck with a maximum weight of 19 tons, equipped with a road sweeper. The vehicle must be from the year 2025 and comply with the specifications outlined in Annex 1 of the procurement documents. Additionally, the contract terms are detailed in Annex 2
Procurement and installation of a fibre laser cutter to enhance manufacturing productivity and reduce costs for defence programme support.
Submit your manufacturing capabilities and expertise for components and assemblies through the Atamis RFI portal.
Seeking manufacturing SMEs to join a framework agreement for supplying components and assemblies through the Atamis portal.
Supply and installation of a factory-built Adiabatic Compressed Air Energy Storage demonstrator plant meeting specified performance requirements for delivery by June 2028, with a budget of up to £1.6 million.