This project involves the second phase of construction work on the Greenway along the west bank of Lake Annecy, specifically between Sevrier and Doussard, covering a distance of 2.3 kilometers. Key tasks include: widening the paved path to 5 meters using light-colored plant-based asphalt, creating a
Contract awarded. Originally published 1 year ago.
No single supplier dominates the field.
In construction, SYNDICATE OF LAKE ANNECY has awarded 5 contracts to 5 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This project involves the construction of gravity collectors (Ø200) along the D114 Route du Mont, covering a length of 385 meters. It includes the installation of 13 connections (Ø160), with 12 connections on the main road and 1 connection on private land. Suppliers are invited to provide services r
This contract involves the construction and expansion of bicycle paths along the Voie Verte du Lac d'Annecy. The work includes widening the paved path to 5 meters, applying light-colored plant-based asphalt, creating a 1.30-meter pedestrian shoulder along the lake, rehabilitating existing structures
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater network managed by SILA is located in the area affected by the road widening works on the straight se
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater treatment network managed by SILA is located in the area affected by the road widening works on the s
Integrated supply team sought to deliver new 730-pupil post-primary school with enabling works and demolition at St Conor's College in Kilrea.
Choice Services Ireland Limited is tendering for the supply and delivery of composite door sets across three specialized categories: standard, accessible secure design, and fire-rated options.
Four-year watercourse maintenance framework across five Northern Ireland locations seeking primary and reserve suppliers for flood defence and river management works.
Hull College invites contractors to bid for external rendering works on Corridor A, scheduled for 2026.