This project involves the second phase of construction work on the Greenway along the west bank of Lake Annecy, specifically between Sevrier and Doussard, covering a distance of 2.3 kilometers. Key tasks include: widening the paved path to 5 meters using light-colored plant-based asphalt, creating a
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In construction, SYNDICATE OF LAKE ANNECY has awarded 5 contracts to 5 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This project involves the construction of gravity collectors (Ø200) along the D114 Route du Mont, covering a length of 385 meters. It includes the installation of 13 connections (Ø160), with 12 connections on the main road and 1 connection on private land. Suppliers are invited to provide services r
This contract involves the construction and expansion of bicycle paths along the Voie Verte du Lac d'Annecy. The work includes widening the paved path to 5 meters, applying light-colored plant-based asphalt, creating a 1.30-meter pedestrian shoulder along the lake, rehabilitating existing structures
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater network managed by SILA is located in the area affected by the road widening works on the straight se
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater treatment network managed by SILA is located in the area affected by the road widening works on the s
Main contractor needed to refurbish Apheresis Suits at Guy's and St Thomas' NHS Foundation Trust to restore equipment to operational standards.
Walsall Council seeks a development partner to transform a 9-hectare brownfield site into a modern four-unit industrial estate with M6 access, supported by Council grant funding.
Procurement for EPC, grid connection, and operations services for a utility-scale solar project in England with delivery targeting February 2027.
Supply and installation of replacement external doors and windows for Leeds City Council housing stock, including scaffolding and associated works.