This project involves the construction of gravity collectors (Ø200) along the D114 Route du Mont, covering a length of 385 meters. It includes the installation of 13 connections (Ø160), with 12 connections on the main road and 1 connection on private land. Suppliers are invited to provide services r
Contract awarded. Originally published 9 months ago.
No single supplier dominates the field.
In construction, SYNDICATE OF LAKE ANNECY has awarded 5 contracts to 5 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction and expansion of bicycle paths along the Voie Verte du Lac d'Annecy. The work includes widening the paved path to 5 meters, applying light-colored plant-based asphalt, creating a 1.30-meter pedestrian shoulder along the lake, rehabilitating existing structures
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater network managed by SILA is located in the area affected by the road widening works on the straight se
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater treatment network managed by SILA is located in the area affected by the road widening works on the s
This project involves the construction of gravity collectors (Ø 200) on public roads (320 meters on RD5, 121 meters on RD 141, 180 meters on Route du Chainet, and 60 meters on Allée de la Ravoire) and private properties (204 meters on private roads, 332 meters in fields, and 43 meters in courtyards
Main contractor needed to refurbish Apheresis Suits at Guy's and St Thomas' NHS Foundation Trust to restore equipment to operational standards.
Walsall Council seeks a development partner to transform a 9-hectare brownfield site into a modern four-unit industrial estate with M6 access, supported by Council grant funding.
Procurement for EPC, grid connection, and operations services for a utility-scale solar project in England with delivery targeting February 2027.
Supply and installation of replacement external doors and windows for Leeds City Council housing stock, including scaffolding and associated works.