The University Hospital Düsseldorf is planning to construct a central waste collection station at the site of the existing building 18.15. This contract involves the phased erection of scaffolding for work related to external thermal insulation composite systems (ETICS), windows, and roofing.
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In construction, UNIVERSITY HOSPITAL DSSELDORF has awarded 7 contracts to 7 suppliers.
+1 more supplier
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The University Hospital Düsseldorf is planning to construct a central waste collection facility at the site of the existing building 18.15. This facility will consist of a rectangular structure measuring 56 x 56.50 meters, surrounded by a perforated metal facade. The building will feature an open co
The Universitätsklinikum Düsseldorf is seeking suppliers for the renewal of WLAN hardware, specifically access points and network switches. This initiative is crucial for ensuring patient safety and enhancing digital capabilities in hospitals. A robust WLAN infrastructure is necessary to support mob
The University Hospital Düsseldorf is constructing a central waste collection point. This contract involves the asphalt work for the courtyard of the new facility. The project includes the creation of two asphalt surfaces in the courtyard of the central waste collection point.
The University Hospital Düsseldorf is planning to build a central waste collection facility. This contract involves the steel construction work for the new facility. The scope includes creating a roof support structure, installing steel trapezoidal sheets, and constructing substructures from profile
Central Bedfordshire Council invites contractor applications for housing repairs and void property works on its social housing portfolio.
Council seeks experienced contractor to maintain pool water treatment systems, chemical dosing, UV systems and moveable floor at Jubilee2 leisure facility from October 2029.
Milton Keynes City Council seeks market views on procurement strategy for flood alleviation and surface water management schemes, with construction planned from Q4 2026.
Contractor required to construct a specialist Care and Support Hub providing dementia care and hospital-to-home transition services in Harrogate, North Yorkshire.