    ContractsConstruction of Sports and Recreation Center in Bolesławiec – Phase II
    Closed contract

    Construction of Sports and Recreation Center in Bolesławiec – Phase II

    Tender closed
    22 Aug 2025
    14 months ago

    This contract involves the design and construction of the second phase of the investment project "Development of the Water and Sports Center at Spacerowa Street 24 in Bolesławiec." The goal is to create a comprehensive sports and recreation facility. The first phase included the establishment of a n

    🇵🇱PolandPublished 15 Jul 2025· 1 years agoviaTED
    Tender closed
    22 Aug 2025
    14 months ago
    Tender deadline passed on 22 Aug 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      22 Aug 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇵🇱Poland

    Lifecycle

    Closed

    Tender closed on 22 Aug 2025. Awaiting award.

    15 Jul 2025Today22 Aug 2025

    Brief

    This contract involves the design and construction of the second phase of the investment project "Development of the Water and Sports Center at Spacerowa Street 24 in Bolesławiec." The goal is to create a comprehensive sports and recreation facility. The first phase included the establishment of a new outdoor pool area with recreational pools and water playgrounds. The second phase, which is the subject of this contract, includes the expansion of the center to include: 1) full-size football fields with artificial turf (including one that meets the requirements for III league matches), 2) an event pavilion for various cultural and sports events, 3) a building for the football fields and event pavilion with changing rooms, social and office areas, and technical rooms, 4) a technical and storage building, 5) a water slide complex with an underground technical chamber and intermediate tank, 6) parking for event pavilion users and additional parking for pool users, 7) beach volleyball courts, 8) a multifunctional field, 9) outdoor stands for the aforementioned fields, 10) space for food trucks and portable toilets, 11) flood protection elements, 12) necessary access roads, pedestrian paths, small architecture elements, and grassy beaches. The contracting authority plans to execute the contract in two parallel phases: a) Phase II.A involves the construction of the water slide complex with an underground technical chamber and intermediate tank, and its commissioning for use – to be executed in a design and build format. This work will cover part of plot number 509/2 located in the area of Bolesławiec. b) Phase II.B involves the completion of the remaining works related to the development of the Water and Sports Center at Spacerowa Street 24 in Bolesławiec – Phase II – also in a design and build format. This work will cover plots numbered: 509/2, 510/3, 510/5, 510/6, 510/7, 1108/1 located in the area of Bolesławiec. The contracting authority informs that the existing facility (completed in Phase I) will operate from June to the end of September each year. During this time, the contractor will conduct work to ensure that the entire facility (Phase I) can be freely and safely used. Detailed scope of work is included in Annex A: functional and utility program with attachments developed for the Development of the Water and Sports Center at Spacerowa Street 24 in Bolesławiec – Phase II – II procedure – attached to the SWZ. The contracting authority anticipates awarding contracts as mentioned in Article 214, paragraph 7 of the Public Procurement Law. The subject of these contracts will be the repetition of construction works as specified in the attached project documentation. The contracting authority does not divide the contract into parts, thus partial offers are not allowed. The reasons for not dividing the contract include the technical interconnection of the construction works. Dividing the contract could hinder its execution, affect its timeliness and correctness, cause excessive technical difficulties, and lead to undesirable cost increases. Furthermore, not dividing the contract does not limit competitiveness. The contracting authority does not foresee advance payments for the execution of the contract. The funding sources for the task covered by the contract: the task is co-financed under the Polish Order program. CPV codes: 71200000-0 Architectural services and similar, 45200000-9 Construction works for the erection of complete buildings or parts thereof and civil engineering works.

    More from CITY MUNICIPALITY BOLESAWIEC

    2 listingsView all →
    AwardedEnvironmental Services🇵🇱Poland

    Waste Collection Services in Bolesławiec

    The contract involves providing waste collection and management services for the city of Bolesławiec from January 1, 2026, to December 31, 2026. This includes establishing and operating selective waste collection points (both central and local), supplying properties with containers and/or bags for w

    PLN 14,221,119CITY MUNICIPALITY BOLESAWIEC
    Published 30 Dec 2025
    AwardedConstruction🇵🇱Poland

    Construction of Sports and Recreation Complex in Bolesławiec – Phase II

    This contract involves the design and construction of Phase II of the investment project titled "Development of the Water-Sports Center at 24 Spacerowa Street in Bolesławiec." The goal is to create a comprehensive sports and recreation facility. Phase I included the establishment of a new outdoor re

    CITY MUNICIPALITY BOLESAWIEC
    Published 3 Jul 2025

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Next Generation Low Carbon Concrete Development Programme

    Join a funded cohort programme to develop low-carbon concrete solutions with expert support and growth mentoring.

    est.£11,500,000
    Published 21 Oct 2026
    Construction🇬🇧United Kingdom

    Footpath Refurbishment Project - Swanley Park

    Swanley Town Council seeks contractors to refurbish and widen two footpaths, with options for various surfacing materials and a focus on accessibility and durability.

    est.£20,000SWANLEY TOWN COUNCIL
    Published 20 Oct 2026
    Construction🇮🇪Ireland

    Classroom Conversion to Special Needs Facility with Outdoor Play Space

    Conversion of an existing classroom into a special needs facility with enhanced outdoor play areas at Scoil Bhride Lackagh.

    est.€65,000Board of Management Scoil Bhride Lackagh
    Published 20 Oct 2026
    Construction🇬🇧United Kingdom

    Subcontracting Framework for Works and Associated Services

    Tayside Contracts is recruiting subcontractors for a flexible framework to deliver works and specialist services through a two-stage procurement process.

    est.£17,200,000Tayside Contracts
    Published 20 Oct 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    463883-2025

    Your fit

    Could you win the next one?

    This one has closed. Sonar reads CITY MUNICIPALITY BOLESAWIEC's work like this against your business and sends the next one that fits, every Monday.

    Check my fit

    Free · Matches every Monday

    CM
    Buyer
    CITY MUNICIPALITY BOLESAWIEC
    Sector
    Construction