The Central Kitchen at Düsseldorf University Hospital is undergoing a complete renovation. As part of this project, a modern meal distribution system for patient catering will be implemented. The kitchen will transition to a Cook & Chill method, utilizing self-produced products.
Contract awarded. Originally published 10 months ago.
The University Hospital Düsseldorf is planning to construct a central waste collection facility at the site of the existing building 18.15. This facility will consist of a rectangular structure measuring 56 x 56.50 meters, surrounded by a perforated metal facade. The building will feature an open co
The Universitätsklinikum Düsseldorf is seeking suppliers for the renewal of WLAN hardware, specifically access points and network switches. This initiative is crucial for ensuring patient safety and enhancing digital capabilities in hospitals. A robust WLAN infrastructure is necessary to support mob
The University Hospital Düsseldorf is constructing a central waste collection point. This contract involves the asphalt work for the courtyard of the new facility. The project includes the creation of two asphalt surfaces in the courtyard of the central waste collection point.
The University Hospital Düsseldorf is planning to build a central waste collection facility. This contract involves the steel construction work for the new facility. The scope includes creating a roof support structure, installing steel trapezoidal sheets, and constructing substructures from profile
Mercy College Beaumont is seeking contractors for heating system replacement, electrical upgrades, and new bike shelter installation as part of a 2026 climate action project.
Coolmine Community School in Ireland is accepting tender submissions for the supply and installation of a sports hall floor.
Emergency mechanical engineering works to upgrade heating (converting to LPG) and water services systems at a school in Ireland.
Tender for fire safety remedial construction works to stairwells and corridors at Kare McMahon Centre, Kilcullen, Ireland, with completion required by December 2026.