BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsTechnical Studies for Renewable Energy System Renovation at ULiège
    Closed contract

    Technical Studies for Renewable Energy System Renovation at ULiège

    Tender closed
    22 Aug 2025
    13 months ago

    This contract involves selecting a specialized engineering firm to conduct a comprehensive study on the renovation of the renewable energy production system at the central heating plant of the University of Liège (ULiège) located at the Sart Tilman campus (site B10). The project aligns with ULiège's

    🇧🇪BelgiumPublished 7 Jul 2025· 1 years agoviaTED
    Tender closed
    22 Aug 2025
    13 months ago
    Tender deadline passed on 22 Aug 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      22 Aug 2025
      1 years ago
    • Sector
      Engineering
      Browse related listings
    • Location
      🇧🇪Belgium

    Lifecycle

    Closed

    Tender closed on 22 Aug 2025. Awaiting award.

    7 Jul 2025Today22 Aug 2025

    Brief

    This contract involves selecting a specialized engineering firm to conduct a comprehensive study on the renovation of the renewable energy production system at the central heating plant of the University of Liège (ULiège) located at the Sart Tilman campus (site B10). The project aligns with ULiège's Transition Roadmap and aims to explore the installation of decarbonized production methods while optimizing energy efficiency and reducing the carbon footprint of the central heating plant. The contract is structured into two main phases: 1. **Firm Phase** - Orientation Studies: - **Phase 1**: Conduct a complete technical study of renovation solutions, including potential full or partial replacements of the current renewable energy production system. This study will provide ULiège with a validated scenario for the renovation based on technical, economic, and environmental criteria. - **Phase 2**: Based on the selected scenario, prepare technical performance specifications and layouts to enable ULiège to initiate a construction contract (likely Design and Build) for the chosen scenario. 2. **Conditional Phase** - Project Management Assistance: - **Phase 3**: Assist ULiège in selecting the contractor for the construction project, including negotiation sessions with bidders. - **Phase 4**: Provide support during the execution of the Design and Build contract, including detailed studies, execution documents, and oversight of the construction process. - **Phase 5**: Assist ULiège during the warranty period, including final acceptance of the project. The conditional phase will be activated by ULiège as needed, within a maximum of two years following the completion of the firm phase. Detailed descriptions of the expected tasks for each phase are provided in the accompanying documents, which outline the technical, economic, and environmental objectives and criteria required by the University.

    More from UNIVERSITY OF LIGE

    4 listingsView all →
    Research & Innovation🇧🇪Belgium

    Supply and Installation of a Spectral Detection Flow Cytometer

    This contract involves the supply of a spectral detection flow cytometer with cell sorting capabilities. The equipment will be made available to numerous researchers as it will be integrated into the flow cytometry technology platform at GIGA. The awarded supplier is required to implement measures t

    UNIVERSITY OF LIGE
    Published 11 Feb 2026
    Healthcare & Medical🇧🇪Belgium

    Medical Imaging Equipment for Veterinary Use

    This contract is part of a project to modernize and expand the medical imaging capabilities of the University Veterinary Clinic – Equine Department at the University of Liège. The project aims to equip the service with a state-of-the-art Cone Beam Computed Tomography (CBCT) system and fluoroscopy th

    UNIVERSITY OF LIGE
    Published 17 Dec 2025
    Facilities Management🇧🇪Belgium

    Supply and Installation of Interior Blinds for the University of Liège

    This is a framework agreement for the supply and installation of interior blinds across all buildings of the University of Liège (ULiège). The contract is for a duration of 1 year, with the possibility of renewal for up to 3 additional years, totaling a maximum of 4 years. The blinds will be supplie

    est.€280,000UNIVERSITY OF LIGE
    Published 19 Nov 2025
    Construction🇧🇪Belgium

    Construction and Renovation of Student Housing in Gembloux

    This contract involves the construction and renovation of 101 student housing units on the Gembloux Agro-Bio Tech campus of the University of Liège (ULiège) as part of Wallonia's recovery plan, specifically under sub-program 243 aimed at creating public interest housing for students. The project wil

    UNIVERSITY OF LIGE
    Published 5 Nov 2025

    Open in Engineering

    4 open listingsView all →
    Engineering🇮🇪Ireland

    Seismic Data Processing Services Contract

    The Marine Institute is accepting bids for seismic data processing services with detailed specifications provided in tender documents.

    est.€80,000Marine Institute
    Published 15 Sept 2026
    Engineering🇬🇧United Kingdom

    Heritage Advisor Services for South England Forest District

    Forestry England is recruiting heritage advisors to provide expert guidance on protecting and managing historic sites and cultural assets across the South England Forest District.

    est.£133,333FORESTRY COMMISSION
    Published 15 Sept 2026
    Engineering🇬🇧United Kingdom

    Mechanical, Electrical & Plumbing Clerk of Works – Force HQ Refurbishment Project

    Recruit an experienced MEP Clerk of Works to oversee a 20-month building refurbishment project at Force HQ in Newcastle, requiring twice-weekly site attendance and local availability.

    The Police and Crime Commissioner for Northumbria
    Published 15 Sept 2026
    Engineering🇮🇪Ireland

    Geomatics Supervisor for Forensic Excavation Project at Tuam

    Recruit a Geomatics Supervisor to manage geospatial data collection for a forensic excavation of a historic institutional burial site in Tuam, Ireland, operating under strict legal and forensic standards.

    est.€368,000The Office of the Director of Authorised Intervention Tuam
    Published 15 Sept 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    443885-2025
    UL
    Buyer
    UNIVERSITY OF LIGE
    Sector
    Engineering