Germany – Metal Construction Works – MPI for Multidisciplinary Natural Sciences - New Construction of Tower VII: Interior Metal Doors

Tender closed
12 Aug 2025
51 weeks ago

This contract involves the supply and installation of various metal construction elements for the new Tower VII at the MPI for Multidisciplinary Natural Sciences. The scope of work includes: - Steel sheet interior doors, with and without fire protection and sound insulation requirements. - Steel-gla

GermanyPublished 7 Jul 2025· 1 years agoTED
Tender deadline passed on 12 Aug 2025.

Decision brief

4 fields
  • Contract value
    Not disclosed
    Source did not declare a figure
  • Tender closed
    12 Aug 2025
    12 months ago
  • Sector
    Browse related listings
  • Location
    Germany

Lifecycle

Closed

Tender closed on 12 Aug 2025. Awaiting award.

7 Jul 2025Today12 Aug 2025

Brief

This contract involves the supply and installation of various metal construction elements for the new Tower VII at the MPI for Multidisciplinary Natural Sciences. The scope of work includes: - Steel sheet interior doors, with and without fire protection and sound insulation requirements. - Steel-glass elements that meet fire protection standards. - Shaft doors that comply with fire protection regulations. Please note that bidders should consider potential impacts on their proposals due to external events (e.g., COVID-19 or the Ukraine war), which may affect material availability, workforce, and the timely submission of required documentation. Any questions related to these issues should be submitted via the eProcurement messaging system before the submission deadline. Execution timelines: Work must commence within 12 working days after receiving the request from the contracting authority (as per § 5 Abs. 2 Satz 2 VOB/B). The request is expected to be sent by October 1, 2025. The project must be completed (ready for acceptance) within 390 working days from the specified deadline (6 working days per week). The estimated duration mentioned in section 5.1.3 of the EU announcement refers to working days.

More from MAX PLANCK SOCIETY DEPT III

4 listingsView all →
ConstructionGermany

Heating, Ventilation, and Air Conditioning Installation

This contract involves the installation of heating, cooling, and sanitary systems for a new building project by the Max Planck Society. The work is divided into three lots: Lot 1 focuses on heating and cooling systems, including connections to district heating and cooling networks, as well as variou

MAX PLANCK SOCIETY DEPT III
Published 3 Dec 2025
ConstructionGermany

Construction Work for Medical Research Facility

The Max Planck Society is seeking suppliers for carpentry work related to the technical and administrative infrastructure of a medical research facility. This project involves the delivery and installation of wooden door elements with metal frames, including 54 office doors, 21 laboratory doors, 8 t

MAX PLANCK SOCIETY DEPT III
Published 13 Nov 2025
ConstructionGermany

Germany – Installation and Laying of Wastewater Pipes – MPI for Intelligent Systems, New Construction Cyber Valley: Sanitary Media

This contract involves sanitary installations for a new construction project, including approximately 5 toilet facilities, 5 washbasins, 2 accessible toilets, 2 accessible washbasins, 2 urinals, 1 shower, 8 AGBs, and 10 instantaneous water heaters with all necessary accessories. Additionally, the pr

MAX PLANCK SOCIETY DEPT III
Published 2 Nov 2025
ConstructionGermany

Construction of Laboratory Facilities for Max Planck Institute

The contract involves the delivery, installation, and commissioning of laboratory facilities at the Max Planck Institute for Multidisciplinary Natural Sciences. This includes a wide range of equipment such as fume hoods, safety workbenches, laboratory workstations, vacuum pumps, autoclaves, refriger