This contract involves ecological support and monitoring for a construction project located east of the K1020 county road, within the Elbdeich water management area. The area is primarily agricultural land and grassland. To prevent flooding from drainage water, the Elbdeich water management system m
Contract awarded. Originally published 10 months ago.
This contract involves the provision of ecological construction supervision services for waterway construction, renovation, and sewer rehabilitation. Suppliers will be responsible for consulting on the integration of nature and environmental protection considerations into construction execution. Key
This contract involves landscaping work as part of the renovation of the right Elbe dike. The project includes environmental compensation measures to offset the impact on nature and landscape. Specifically, the compensation measure (A1) requires the planting of 296 Flatter elms, 100 English oaks, 15
This contract opportunity is for custodial services at the property of the State Enterprise for Flood Protection and Water Management in Halle (Saale). The services required include maintenance of the outdoor areas, winter services, maintenance and inspection of building technical facilities, and ge
This contract involves the provision of external monitoring services, surveying, quantity assessment, and documentation necessary for the construction project "HWSB Dike Hohenwarthe km 0.1 - 1.126". The project includes the renovation and elevation of the existing Elbe dike, approximately 1100 meter
Mercy College Beaumont is seeking contractors for heating system replacement, electrical upgrades, and new bike shelter installation as part of a 2026 climate action project.
Coolmine Community School in Ireland is accepting tender submissions for the supply and installation of a sports hall floor.
Emergency mechanical engineering works to upgrade heating (converting to LPG) and water services systems at a school in Ireland.
Tender for fire safety remedial construction works to stairwells and corridors at Kare McMahon Centre, Kilcullen, Ireland, with completion required by December 2026.