BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsEngineering Services for New Community Center in Wellen, Germany
    Closed contract

    Engineering Services for New Community Center in Wellen, Germany

    Tender closed
    15 Jul 2025
    13 months ago

    The project involves the construction of a new community center in Wellen, including the design of the outdoor area. The existing community center is not economically viable to renovate, so it will be replaced with a new building on the same site. The new community center will serve as a venue for c

    🇩🇪GermanyPublished 15 Jun 2025· 1 years agoviaTED
    Tender closed
    15 Jul 2025
    13 months ago
    Tender deadline passed on 15 Jul 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      15 Jul 2025
      1 years ago
    • Sector
      Engineering
      Browse related listings
    • Location
      🇩🇪Germany

    Lifecycle

    Closed

    Tender closed on 15 Jul 2025. Awaiting award.

    15 Jun 2025Today15 Jul 2025

    Brief

    The project involves the construction of a new community center in Wellen, including the design of the outdoor area. The existing community center is not economically viable to renovate, so it will be replaced with a new building on the same site. The new community center will serve as a venue for community events and support local associations, fostering a vibrant community life in Wellen. The design should accommodate various uses, with a space program of approximately 450 square meters. The building organization should be compact and efficient, optimizing necessary access and traffic areas. The project must be designed to be barrier-free in accordance with building regulations and standards. The adjacent outdoor areas will be used as a parking lot and event space. A music pavilion on the property will be preserved and must have barrier-free access. To complete the planning team, a technical engineering office is required to provide planning services for the following systems: - Wastewater, water, and gas systems - Heating supply systems - Air conditioning systems - Electrical systems - Communication, security, and information technology systems - Lifting systems - Use-specific systems According to the current rough cost estimate, the eligible costs amount to €760,000 gross. The distribution of the eligible net costs for the systems can be found in the fee schedule. Services for phases 1-3 and 5-9 are required for all mentioned systems, with phase 4 for system group 410 and optionally for other system groups. Initially, phases 1 to 3 will be commissioned. After a funding application is submitted and total financing is secured, phases 5 to 9 will be commissioned according to HOAI, which cannot be verified in terms of timing yet. According to HOAI evaluation criteria, the project falls into fee zone II. As stated in the General Terms and Conditions for the Architect and Engineering Contract, drawings must be submitted in IFC format. Planning is expected to begin at the end of August 2025.

    Open in Engineering

    4 open listingsView all →
    OpenEngineering🇬🇧United Kingdom

    Hot Cell Integration and Unified Ventilation System

    Integration of 5 hot cells (3 legacy and 2 new) into a single nuclear-compliant ventilation system for the Materials Recovery Facility.

    UK ATOMIC ENERGY AUTHORITY
    Published 21 Aug 2026
    Engineering🇬🇧United Kingdom

    A816 Bealach Mor Permanent Road Solution - Consultant Services

    Argyll and Bute Council seeks a consultant to manage the A816 Bealach Mor landslip project from temporary repairs to permanent road solution through business case development and construction preparation.

    Argyll and Bute Council
    Published 21 Aug 2026
    Engineering🇬🇧United Kingdom

    Water Temperature Monitoring and Inspections for Legionella Control

    Provide water temperature monitoring and Legionella inspections across Lancashire County Council sites in either the North or South region, ensuring HSE compliance.

    est.£1,755,000LANCASHIRE COUNTY COUNCIL
    Published 21 Aug 2026
    Engineering🇮🇪Ireland

    Private Water Supply Sampling and Analysis Contract - County Wexford

    Wexford County Council invites tenders for compliance sampling and analysis services for approximately 170 private and group water supplies under EU drinking water regulations.

    WEXFORD COUNTY COUNCIL
    Published 21 Aug 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    386296-2025
    AC
    Buyer
    ASSOCIATION COMMUNITY ADMINISTRATION KONZ FOR THE OG WELLEN
    Sector
    Engineering