The University Hospital Düsseldorf is planning to construct a central waste collection point. This contract includes the roofing and waterproofing works for the new building. The scope of work involves insulating and sealing the roof area, as well as creating an extensive green roof that will incorp
Tender closed on 17 Jul 2025. Awaiting award.
No single supplier dominates the field.
In construction, UNIVERSITY HOSPITAL DSSELDORF has awarded 7 contracts to 7 suppliers.
+1 more supplier
Across construction, the most active winners are TARMAC TRADING LIMITED, HOLCIM UK LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The University Hospital Düsseldorf is planning to construct a central waste collection facility at the site of the existing building 18.15. This facility will consist of a rectangular structure measuring 56 x 56.50 meters, surrounded by a perforated metal facade. The building will feature an open co
The Universitätsklinikum Düsseldorf is seeking suppliers for the renewal of WLAN hardware, specifically access points and network switches. This initiative is crucial for ensuring patient safety and enhancing digital capabilities in hospitals. A robust WLAN infrastructure is necessary to support mob
The University Hospital Düsseldorf is constructing a central waste collection point. This contract involves the asphalt work for the courtyard of the new facility. The project includes the creation of two asphalt surfaces in the courtyard of the central waste collection point.
The University Hospital Düsseldorf is planning to build a central waste collection facility. This contract involves the steel construction work for the new facility. The scope includes creating a roof support structure, installing steel trapezoidal sheets, and constructing substructures from profile
RBGE invites qualified contractors to design and install specialist interpretative displays for the Palm Houses exhibition spaces.
St Albans City and District Council is conducting pre-market engagement to gather supplier feedback and refine requirements for the William Bird Community Hub project.
Multi-lot framework agreement for the supply of water industry fittings across five specialized product categories with sizes ranging from 80mm to 1200mm.
Leeds College of Building seeks a Principal Contractor to manage the design and refurbishment of the CTEC Building in Leeds.