This contract involves the gradual supply of stone products throughout 2025, with specific types and estimated quantities detailed in the attached documents. The contract is divided into three parts: Part 1 includes the supply of stone curbs and edges; Part 2 covers the supply of stone cubes; and Pa
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In construction, ROAD REPAIR AND MAINTENANCE PLANT has awarded 4 contracts to 4 suppliers.
Across construction, the most active winners are SPECIALIST COMPUTER CENTRES PLC, PORTAKABIN LIMITED, Allerton Damp Proofing Limited — the field to beat, or your route in as a partner.
This contract involves the delivery of two brand new backhoe loaders, manufactured in 2025. The procurement is divided into two parts: Part 1 involves the delivery of one backhoe loader, and Part 2 involves the delivery of another backhoe loader. The deliveries must comply with the specifications ou
This framework agreement involves the ongoing procurement of mineral-asphalt mixtures throughout 2026 for construction work in the city of Warsaw. The specific types and quantities of mixtures required are detailed in the attached document (Annex 1 to the procurement notice). Deliveries must comply
This contract involves the delivery of three brand new four-axle trucks with a maximum weight of 34 tons, produced in 2025. The procurement is divided into three parts, each requiring the supply of one new truck. Suppliers must adhere to the specifications outlined in the attached documents. The tru
This contract opportunity involves the supply of brand new mini wheel loaders with side control, including necessary attachments. The loaders must be from the year 2025. The procurement is being conducted in parts, allowing for flexibility in delivery. Interested suppliers should refer to the provid
Opportunity to design and fitout the British Council's Penang office with reconfigured layout and new examination facilities.
Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.
Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.
Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.