Skip to content
BidSonarBidSonar

Closed contract

Road Repair Project in Hlinka – Slezské Pavlovice

This public procurement contract involves the selection of a contractor to carry out construction work for the project "Repair of the surface of road III/45726 Hlinka – Slezské Pavlovice". The work includes the repair of the road surface in the first phase, which consists of replacing a 100 mm aspha

Published 5 Jun 2025 · 1 year agoTED

Tender deadline passed on 10 Jul 2025.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

10 Jul 2025

1 year ago

Contract value

est.CZK 13,839,084

CZK

Sector

Construction

Browse related listings

Location

Czech Republic

Publisher
Publications Office of the European Union
Record ID
366691-2025

Lifecycle

Tender closed on 10 Jul 2025. Awaiting award.

Closed
  1. Published5 Jun 20251 year ago
  2. Tender deadline10 Jul 202517 months ago

Brief

This public procurement contract involves the selection of a contractor to carry out construction work for the project "Repair of the surface of road III/45726 Hlinka – Slezské Pavlovice". The work includes the repair of the road surface in the first phase, which consists of replacing a 100 mm asphalt layer and partially replacing the underlying layer with a thickness of 200 mm. A portion of the underlying layer, 250 mm thick, will be recycled using cold recycling technology. In the section from 0.000 to 1.790 km, only the unpaved shoulder will be restored. In the section from 1.790 to 3.050 km, structural layers will be excavated, local repairs of the underlying layer (approximately 20%) and local repairs of the shoulder (approximately 80%) will be conducted. The structural layers of the roadway (ACP, ACO) will be partially replaced using cold recycling technology, while maintaining the existing level. This phase of construction also includes the repair of four road culverts, where existing concrete pipes DN 400 and DN 600 will be replaced with new plastic DN 600 pipes. The unpaved shoulders will be restored, drainage adjustments will be made, and repairs to the drainage inlets and horizontal road markings will be carried out. The construction will take place under a complete closure of road III/45726, with access allowed for emergency services and buses. The contracting authority requires the selected contractor to inform local residents about the planned closure. The specific method of communication (e.g., printed flyers, posting on the municipality's website, or in the municipality's mobile application) will be communicated to the contractor upon handover of the construction site. The technical condition of the section of road III/45726 is rated at level 5.

Track record

Open field. No single supplier dominates the field.

6 awards · 6 winners

In construction, ADMINISTRATION OF ROADS OF THE MORAVIANSILESIAN REGION CONTRIBUTORY ORGANIZATION has awarded 6 contracts to 6 suppliers.

Who wins here

  1. PORR AS1× · 17%
  2. M SILNICE AS1× · 17%
  3. M - SILNICE a.s.1× · 17%
  4. STRABAG a.s.1× · 17%
  5. PORR a.s.1× · 17%
  6. STRABAG AS1× · 17%

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from ADMINISTRATION OF ROADS OF THE MORAVIANSILESIAN REGION CONTRIBUTORY ORGANIZATION

4 listingsView all

Project Documentation and Engineering Services for Road Repair

ADMINISTRATION OF ROADS OF THE MORAVIANSILESIAN REGION CONTRIBUTORY ORGANIZATION

This public procurement contract involves hiring a single supplier to develop project documentation for the construction of the road "PD Silnice II/451 - Flood Damage on Road II/451 Vidly – Vrbno, CRR 142185." The documentation will include the necessary materials for obtaining the required permits

AwardedConstructionCzech RepublicPublished 26 Aug 2025

CZK 12,400,000

Open in Construction

4 open listingsView all