This contract involves the collection of solid waste from the facilities of the Maritime Office in Gdynia. The contract is divided into seven parts: Part 1: Collection of solid and segregated waste from municipal waste containers at the Bosmanat Port Frombork; Part 2: Collection of solid and segrega
Contract awarded. Originally published 1 years ago.
This contract involves the artificial replenishment of the coastline in Ustka, specifically between kilometers 229.000 and 233.500. Detailed specifications for the project can be found in the functional and operational program, which is attached as Annex 3 to the procurement documentation. Suppliers
This contract involves programming services to adapt the existing National Single Window system to meet new technical, operational, and legal requirements set by the European Parliament and Council Regulation (EU) 2019/1239, which establishes the European Maritime Single Window system. The work will
This contract involves providing expert consulting services for the project titled "Protection of Species and Natural Habitats in Areas Managed by the Director of the Maritime Office in Gdynia." The scope of work includes: 1. Developing methodologies for selected tasks within the project, which will
This contract involves the removal of contaminated sediment from the bottom of the Elbląg River, specifically from the waterway section between point P2 and the Port, located in the Warmian-Masurian Voivodeship, within the Elbląg County, and the municipalities of Elbląg and the City of Elbląg. The p
Tender for farm plastic waste collection, processing, and recycling services from Drummee Transfer Station in County Fermanagh.
Rutland County Council seeks a contractor to manage green waste treatment and processing from household kerbside collections and recycling centres, with tender release anticipated in July 2026.
FLS is renewing a contract to collect deer and wildlife waste from 39 larder locations across Scotland.
Provide continued water quality and hydrological monitoring services across three moorland catchments for United Utilities' 20-year environmental research programme (September 2026 to April 2030).