The Helmholtz Center Berlin for Materials and Energy GmbH (HZB) is planning to establish an Alarm Reception Center (AES) in the currently under-construction supply technology building (VT II) at the Wilhelm Conrad Röntgen Campus in Berlin-Adlershof. This new AES will replace the existing gate respon
Contract awarded. Originally published 1 years ago.
The Helmholtz Center Berlin for Materials and Energy GmbH is planning the construction of a new supply technology building (VTII) in Berlin Adlershof. This new building will be a compact reinforced concrete structure featuring a ventilated exterior wall cladding with a prefabricated wooden facade. S
The Helmholtz Center Berlin intends to award a framework contract for installation and assembly work, as well as the supply of necessary materials, for a duration of two years (24 months) with an option to extend for an additional two periods of 12 months each. The work includes setting up network a
The Helmholtz Institute for Polymers in Energy Applications (HIPOLE Jena), supported by the Helmholtz Association, is seeking automated laboratory equipment for the development of new materials used in energy storage and conversion. The focus is on the rapid and reproducible manufacturing, formulati
The Helmholtz Center Berlin for Materials and Energy GmbH (HZB) is an independent scientific research center under the Helmholtz Association, located in Berlin-Adlershof and Wannsee. The electron storage ring BESSY II provides high-brilliance synchrotron radiation from the terahertz to the X-ray ran
Supply, installation, and servicing of navigation buoys and associated marine equipment in Donegal Bay, including removal of existing systems and deployment of new 1.2-meter diameter buoys.
Refurbishment and repair services required for sash windows at the Moyderwell building in Tralee, County Kerry.
Padstow Town Council invites expressions of interest from contractors for refurbishment of Community Hub roof and two toilet blocks, plus construction of new toilet facilities at Lawn's car park, with works scheduled for Q4 2026.
Refurbishment and single storey extension project for a residential home located on Rosary Road in Oldham.