This project involves the construction of a new primary school in Bad Neuenahr, which will accommodate five classes and include a cafeteria and outdoor facilities. Following the destruction caused by the flood disaster in 2021, the ground floor will be built using solid construction methods, while t
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In engineering, CONSTRUCTION AND DEVELOPMENT COMPANY BAD NEUENAHRAHRWEILER LTD has awarded 5 contracts to 5 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
The project involves the construction of a new fire station for the Ahrweiler Volunteer Fire Department, located on Ramersbacher Straße. The existing building was severely damaged by flooding in 2021 and is no longer repairable. A new facility with 12 parking spaces will be built south of the Ahr Ri
This project involves the construction of a new four-group kindergarten (Kita) to replace the St. Pius kindergarten, which was destroyed during the Ahr flood in 2021. The new building will be a two-story structure built with solid materials, covering an area of approximately 3,220 m², with a net usa
This project involves the construction of a new kindergarten to replace the Blandine-Merten-Haus, which was destroyed during the 2021 Ahr flood. The new building will be a two-story structure with solid construction and a partially wooden facade, situated on a plot of approximately 4,465 m². It will
This contract involves the construction of a new four-group kindergarten (Kita) to replace the St. Pius kindergarten, which was destroyed during the Ahr flood in 2021. The project includes a two-story solid construction building with an area of approximately 3,220 m² and a net usable space of around
TRG is inviting tenders for lift refurbishment and replacement work across four London properties, with flexible lot options and concurrent delivery requirements.
Wemyss Metal Mine remediation project implementing water management and drainage infrastructure improvements to meet environmental and regulatory standards under the Wales Metal Mine Programme.
SWR seeks a Depot Enhancement Specialist to design and progress the Wimbledon Traincare Depot upgrade through Network Rail PACE stages ES4-ES5 over 12 months for approximately £1.094 million.
Coole Park Nature Reserve seeks qualified suppliers for a complete water supply infrastructure upgrade including watermain, storage tank, treatment facility, and service ducting installation.