This public procurement contract involves the implementation of the project titled 'Trolleybus Routes in the Northern Suburbs of Plzeň.' The scope of work includes several key activities: 1. Construction project activities, which involve creating documentation necessary for the permit application an
Tender closed on 19 May 2025. Awaiting award.
This public procurement contract involves the renovation and expansion of Pavilion C at the school located on Terezie Brzková Street in Plzeň. The expansion will include the creation of specialized classrooms, offices, and a multifunctional classroom/community center. The existing hall on the first
This contract involves the construction of two separate buildings: Nováček II and a Home for Individuals with Autism Spectrum Disorder (ASD). Both buildings are designed to provide housing for individuals with ASD, often in combination with other mental and physical disabilities. Residents will live
This contract involves the modernization of the access control system at the Slovany and Lochotín swimming pools in Plzeň. The work includes the removal of existing turnstiles and the supply and installation of new turnstiles. Additionally, the project includes the replacement of electronic locks on
This public procurement contract involves the project titled 'Technology Upgrade for Traffic Signal Systems in Plzeň.' The project documentation, prepared by engineer Jiří Špičan in November 2023, outlines the necessary work for upgrading traffic signal systems (SSZ) at various locations in Plzeň. T
Supply and install engineered water break tanks at two locations including design, procurement, and installation services.
Nottingham City Council invites bids for the £5.56 million development of a former church into social housing in Clifton.
Weston-super-Mare Town Council seeks experienced contractors to rebuild a collapsed £75,000 stone retaining wall at Milton Road Cemetery, with Expression of Interest submissions due by 6 November 2026.
Design and construct a fully equipped public toilet block at Rendlesham Forest, Suffolk, for completion by March 2027.