Construction of Waste Collection Facility in Düsseldorf
The University Hospital Düsseldorf is planning to construct a central waste collection facility at the site of the existing building 18.15. This facility will consist of a rectangular structure measuring 56 x 56.50 meters, surrounded by a perforated metal facade. The building will feature an open co
ClosedConstructionGermanyPublished 7 Oct 2025