The project involves conducting condition assessments of bridge bearings for the UPlaNS section ZH-Ost – Kloten Süd, which has been in operation since the 1970s. No comprehensive maintenance project has been carried out since its commissioning. This procurement seeks suppliers to perform these asses
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In engineering, FEDERAL OFFICE OF ROADS ASTRA BRANCH WINTERTHUR has awarded 6 contracts to 6 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves engineering services for the maintenance of two bridge structures located on the N01 section between Uzwil and Winkeln in St. Gallen. The project aims to assess the condition of the bridges and develop a maintenance plan. If repairs are deemed economically unfeasible, the proj
The project N01/42, 46 involves reducing existing traffic bottlenecks at the Brüttisellen junction to the Zürich-East junction and improving traffic flow. Key components include establishing a permanent emergency lane usage and various construction measures on the track and structures. Additional pr
The project 'N15/02 UPlaNS Brüttisellen - Uster Ost' involves the renewal of the existing BSA (Basic Service Area). This renewal is based on a detailed assessment of the current condition, which is the focus of this contract (Lot 71). The work includes: - Opening and closing of shafts - Documentatio
This contract involves the repair, replacement, or construction of wildlife protection fences along national roads in Switzerland. Suppliers are invited to provide detailed proposals for the work required. For a comprehensive description of the services needed, please refer to the attached documents
The Crown Estate invites suppliers to express interest in providing metocean survey services, technical advisory support, and survey management for a 12-month offshore wind development campaign starting mid-2027.
Develop an updated Strategic Regeneration Framework for Manchester Piccadilly that integrates transport connectivity, economic growth, and adjacent regeneration strategies.
Green Action Trust requires design consultant services for Dargavel Burn restoration project, covering detailed design and technical specification stages with potential extension for procurement and supervision services.
Maidstone Borough Council requires qualified contractors to conduct regular General (biennial) and Principal (six-yearly) inspections of its bridge infrastructure in accordance with CS 450 standards.