Multi-supplier framework agreement for fire helmets and rescue headgear with an 8-year term and anticipated reopenings in 2029 and 2032-2033.
Contract awarded. Originally published 3 days ago.
Mostly framework call-offs rather than head-to-head competition.
In manufacturing, Kent and Medway Fire and Rescue Authority has awarded 8 contracts to 6 suppliers.
Across manufacturing, the most active winners are Arco Limited, HUNTER APPAREL SOLUTIONS LIMITED, BRUDRA s.r.o. — the field to beat, or your route in as a partner.
Open framework agreement for structural firefighting PPE with four approved suppliers available for call-off through July 2029, with framework reopening anticipated in 2029 and 2032-2033.
Open framework agreement for firefighter PPE cleaning and maintenance services, currently awarded to three suppliers, with framework reopenings anticipated in July 2029 and July 2032-2033.
Open framework contract for supply of fire structural boots to UK fire services, with an 8-year term and opportunities for new suppliers to join at scheduled reopening dates in 2029 and 2032-2033.
Framework agreement for specialist decontamination cleaning of firefighter protective equipment with 2 approved suppliers and 8-year maximum term.
Fully comprehensive lift maintenance service contract for passenger, goods, bed, and platform lifts at NHS hospital facilities including all parts, call-outs, and specialist cleaning.
Framework contract for supply, installation, maintenance and relocation of mobility aids including stairlifts, platform lifts and ceiling hoists for disabled residents.
Design and deploy an autonomous robotic perimeter patrol proof-of-concept using Spot technology to enhance critical infrastructure monitoring and reduce manual inspections.
Supply and commission an IEC 61850-compliant SCADA system to replace legacy control systems at a 400/33kV substation with site-wide master control and intelligent interlocking capabilities.