This project involves the reconstruction of an existing section of the left bank flood protection embankment along the Warta River, covering a length of 1,010 meters (from km 2+640 to km 3+650). The work includes rebuilding a crossing at km 2+995 and a culvert at km 2+665 as part of the investment t
Tender closed on 23 Mar 2026. Awaiting award.
This contract involves construction work for the project titled 'Restoration of the Water Reservoir in Borków'. The work is located in the Świętokrzyskie Voivodeship, in the Kielce County, within the Daleszyce municipality. The aim is to ensure the proper technical condition of the Borków water rese
This contract involves the long-term lease of printing equipment for the Regional Water Management Authorities in Poznań and Bydgoszcz. It includes the installation of systems for tracking print and copy usage, as well as comprehensive service and maintenance support for the leased devices. Supplier
This contract involves providing cleaning services for office spaces and window washing at the headquarters of the Regional Water Management Authority in Poznań, Poland, from 2026 to 2028. The services include: 1. Office Cleaning: - Location: ul. Chlebowa 4/8 - Total area: 2459.07 m², with 2352.32 m
This contract involves the development of complete design and cost documentation for the construction of a dry reservoir on the Jedlica River, located at kilometer 2+090. The selected supplier will also be responsible for obtaining all necessary administrative decisions, including the investment per
Mercy College Beaumont is seeking contractors for heating system replacement, electrical upgrades, and new bike shelter installation as part of a 2026 climate action project.
Coolmine Community School in Ireland is accepting tender submissions for the supply and installation of a sports hall floor.
Emergency mechanical engineering works to upgrade heating (converting to LPG) and water services systems at a school in Ireland.
Tender for fire safety remedial construction works to stairwells and corridors at Kare McMahon Centre, Kilcullen, Ireland, with completion required by December 2026.