Kozloduy Nuclear Power Plant EAD
This contract involves the supply of internal reactor detector assemblies (IRDA) for units 5 and 6 of the VVER 1000 reactor type. These assemblies are essential for monitoring the parameters of the active zone within the reactor.
AwardedEnergy & Utilities🇧🇬BulgariaPublished 23 Feb 2026
€5,717,123
Kozloduy Nuclear Power Plant EAD
This contract involves the delivery of 209 iodine filters, which include a housing and a filter cartridge (model AUI – 1500 or equivalent) with a disassemblable design. This design allows for the replacement of the sorbent during operation. The sorbent consists of activated carbon impregnated with t
AwardedManufacturing🇧🇬BulgariaPublished 17 Jul 2025
BGN 22,275,000