Excavation Work for Electrical Substation and Transformer Stations in France
This contract involves excavation work for an electrical substation and two transformer stations. The project includes the development of the following locations: • Substation: Saint Mesmin (PK 147+670) • Transformer Station P7: Marnay sur Seine (PK 115+750) • Transformer Station P8: Maizières (PK 1
AwardedConstructionFrancePublished 21 Aug 2025
€1,497,049