A United Kingdom supplier, with 1 awarded contract, totalling £146k, most recently 6 months ago.
The project involves the expansion of the existing school building at St. Suitbertus Primary School, which was originally built in 1997 and has two floors. The northwest wing of the building will be connected to the existing structure as part of this construction project. Additionally, an elevator w