This contract involves the installation of floor and wall coverings, including tiling, stonework, and interior painting, as part of the construction of a cultural center in Chennevières-sur-Marne, Val de Marne. The work is divided into two lots: Lot 9 focuses on wall and floor coverings, while Lot 1