A United Kingdom supplier, with 4 awarded contracts, totalling £1.0m, most recently 10 months ago.
This contract involves metalwork for the construction of laboratory buildings in Germany. Specifically, it includes the installation of approximately 40 steel railings (flat steel) in three stairwells, each with 5-6 floors, with lengths ranging from 3.8 to 7.5 meters. Additionally, it requires about
The Gemeinde Veitshöchheim is seeking suppliers for metal construction works, specifically for the installation of six exterior steel doors weighing approximately 750 kg, a steel sheet canopy, around 280 meters of fire barriers made of 6mm steel sheet, approximately 425 meters of window frames made