AwardedConstruction🇩🇪Germany
Railway Bridge Construction in Krefeld, Germany
This project involves the construction of a railway bridge over Vorster Street in Krefeld. The existing single-track, non-electrified railway line 2501 crosses Vorster Street at kilometer 1.888. The bridge is necessary due to the poor condition of the existing structure, which must be replaced to en
DB INFRAGO AG BUSINESS UNIT TRACK BUKR 16