FIRESTA FI ER REKONSTRUKCE STAVBY A S
A United Kingdom supplier, with 2 awarded contracts, totalling £681.1m, most recently 10 months ago.
This public procurement contract focuses on urgent measures to ensure the safety of bridge operations in the Ústí Region of the Czech Republic. The primary task involves the rapid removal of significant defects identified during bridge inspections. These defects pose or may pose a risk to the safety
This contract involves the replacement of the wearing course across the entire width of the roadway and, locally, the base layer of the roadway on road II/431 in Vyškov, Křečkovská Street. The project is managed by the South Moravian Region's Road Administration and Maintenance Organization. The tot
This contract involves the maintenance and repair of secondary and tertiary roads in the South Moravian Region, as outlined in the relevant regulations. The framework agreement covers ongoing maintenance activities and repairs for these roads. Key tasks include: - Restoring road surfaces, strengthen
This contract involves the replacement of the wearing and base asphalt layers of road I/19 between kilometers 218.408 and 218.664. The project aims to improve road safety and driving conditions. Suppliers are invited to provide their bids for this construction work, which is managed by the Road and
This contract involves construction work for the project "Tram Depot Pisárky, Phase III - Tram Loop." The project focuses on redesigning the track layout in the eastern part of the tram depot area and creating a new tram loop south of the Lipová stop in Brno. It includes a new arrangement of the tra