A United Kingdom supplier, with 3 awarded contracts, totalling £5.8m, most recently 12 months ago.
This contract involves the manufacturing and installation of control and safety technology along the railway line from Seckenheim to Wieblingen. The project aims to enhance operational stability on the specified section of the railway, ensuring safe and efficient transportation services.
This contract involves the supply and installation of an emergency control station in the technical room of the train safety system located in the tunnel at Ludwigshafen Main Station. The project includes providing a control cabinet and a fully functional electronic interlocking control station. The