Skip to content
BidSonarBidSonar

Awarded contract

Steel Chimney Dismantling and Adaptation Works at Salisbury District Hospital

Main contractor required to dismantle one steel chimney stack and undertake adaptation works at Salisbury District Hospital, funded through NHS Estates Safety Funding 2025/26.

Published 18 Jun 2026 · 5 months agoFind a Tender

View on sourceFind a Tender

Award notice and full record on the publisher's site

Closing date

Not published

No closing date published

Contract value

£933,647

Pounds sterling

Sector

Construction

Browse related listings

Location

United Kingdom

England

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-05a3be

Suppliers

1 supplier

Lifecycle

Contract awarded. Originally published 5 months ago.

Awarded

18 June 2026

Awarded — no open tender advertised

Brief

Salisbury District Hospital is seeking a main contractor to dismantle and adapt steel chimney structures as part of NHS Estates Safety Funding 2025/26. The two chimneys, built in 1988, are approximately 38 meters tall and constructed from mild steel, located within an internal courtyard with no vehicular access. The scope of work includes: installing temporary boiler and generator equipment, switching off main plant systems, redirecting generator flues, removing the eastern chimney stack, weatherproofing the resulting void to the plant room roof, and reactivating main plant equipment (with CHP and Boiler 3 remaining isolated). Following engineering appraisal and optioneering studies by Mott MacDonald, this project aims to modernize the hospital's heating infrastructure while maintaining operational continuity. The site is located at Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire, SP2 8BJ. Contractors should have experience with high-access industrial works, temporary plant installation, and healthcare facility operations.

Track record

Thin record. Only 2 prior awards here — too little to read.

2 awards · 2 winners

In construction, SALISBURY NHS FOUNDATION TRUST has awarded 2 contracts to 2 suppliers.

Who wins here

  1. Westmade Ltd1× · 50%
  2. Cara Glass Ltd1× · 50%

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from SALISBURY NHS FOUNDATION TRUST

4 listingsView all

Open in Construction

4 open listingsView all