Lead an architect-led multi-disciplinary team to design a new hospital facility through RIBA Stages 2-4 over 4-7 years, delivering integrated design solutions aligned with national hospital standards.
Contract awarded. Originally published 1 months ago.
Mostly framework call-offs rather than head-to-head competition.
In engineering, JAMES PAGET UNIVERSITY HOSPITALS NHS FOUNDATION TRUST has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
Provide audiology assessment, hearing aid fitting, and related clinical services for referred patients at the Head Provider's facility.
James Paget University Hospitals is seeking a contractor for the Future Paget Programme under the Hospital 2.0 Alliance Framework, with a phased approach starting with Stage Zero early works valued at approximately £1.95 million.
Design and install a 375kW solar panel system at James Paget University Hospital while preserving the existing feed-in tariff contract.
Deliver comprehensive clinical healthcare services to patients in their homes as an alternative to traditional hospital-based care.
Ireland seeks a health and safety consultancy services framework with an electronic management system for temporary traffic management, work plans, and asset documentation.
Architectural services required for a new 3G sports dome and community facility refurbishment project in Ireland, supported by the PEACEPLUS programme, with tender submissions closing 20th November 2026.
Ireland's Department of Agriculture seeks an accredited laboratory to analyze approximately 1,500 nematode samples annually from soil, peat, and plant materials to support national plant health controls and protect the agricultural industry.
AFC Harrogate requires a professional asset condition survey to evaluate current facility and asset conditions for planning and investment purposes.