This infrastructure contract covers comprehensive site development works for the Weyside Urban Village regeneration project in Guildford, spanning two phases. The scope includes site surveys and investigations, demolition of existing structures (including the Guildford Council Depot), vegetation and topsoil clearing, contamination remediation, site levelling and platform preparation, complete drainage systems (pipework, manholes, attenuation tanks, interceptors, swales and basins), utility infrastructure (ducting, chambers, pipework), highway formation, street furniture and lighting, pedestrian and cycle path improvements, junction works under Section 278 of the Highways Act, and reptile translocation fence maintenance. Works are located at Phase 1 (land south of Bellfield Allotments, GU1 1QG), Phase 3 (existing Council Depot site, GU1 1QE), and non-motorised user routes across multiple Section 106 sites. Contractors should note that concurrent works by the Employer and statutory undertakers will include groundwater monitoring, ecological and archaeological watching briefs, utilities diversions, sewerage treatment works relocation, and adjacent site development activities.