Conduct a 2-month concept design study for HVAC systems in the Tokamak building at West Burton Power Station, including technical architecture, ventilation strategy, and cost estimation.
27 days left to bid. Opened today, deadline 12 Oct 2026.
No single supplier dominates the field.
In engineering, UK Fusion Energy Ltd has awarded 8 contracts to 7 suppliers.
+1 more supplier
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
Design and manufacturability assessment of a novel transmission system for the MAST-U electron beam welding transmission line facility.
Gain access to cutting-edge manufacturing research, industry expertise, and collaborative innovation opportunities through MTC's Industrial Membership Program.
Validate measurement techniques for aluminium waveguide straightness and cylindricity assessment.
Design concept study for moveable shielding system for the UK's prototype fusion energy plant at West Burton.
£5 million grant funding opportunity for suppliers to develop and install publicly accessible EV charging infrastructure in the North East, with focus on supporting residents without off-street parking.
Kier Infrastructure seeks qualified suppliers to conduct structural surveys on bridges for design and environmental assessment purposes.
Wrexham County Borough Council seeks a multidisciplinary design team to deliver project management and design services for Tŷ Pawb Phase 2 development from feasibility completion through RIBA Stage 6 handover.
The Marine Institute is accepting bids for seismic data processing services with detailed specifications provided in tender documents.