Skip to content
BidSonarBidSonar

Closed contract

Design and Installation of Tank Cover Systems for Water Treatment

Procurement of design and installation services for impermeable tank cover systems across approximately 24 water treatment sites to reduce process emissions as part of the Net Zero Investment Programme.

Published 25 Jun 2026 · 5 months agoFind a Tender

View on sourceFind a Tender

Original closed notice on the publisher's site

Closing date

Not published

No closing date published

Contract value

est.£37,400,000

Pounds sterling

Sector

Construction

Browse related listings

Location

United Kingdom

England

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-0654b0

Lifecycle

No longer open. Published 5 months ago.

Closed

25 June 2026

Closed — no tender deadline was published

Brief

The Contracting Authority is seeking suppliers to design, supply, deliver, install, test, and commission impermeable tank cover systems for wastewater and water treatment facilities. This procurement covers approximately 23 sites (subject to change) across the AMP8 Net Zero Investment Programme, with an additional regulatory commitment site, targeting a reduction of approximately 20,029 tCO₂e in process emissions. The scope encompasses Activated Sludge Plant (ASP) lanes and Liquor Treatment Plant (LTP) tanks used in wastewater and sludge treatment. Tank covers must be suitable for installation over live operational assets without compromising process performance, maintenance access, or operational requirements. Successful suppliers will be responsible for complete design development, calculations, technical drawings, fabrication, quality assurance, delivery, installation, testing, commissioning, and provision of operation and maintenance documentation with warranties. Suppliers must assess existing tank structures for suitability to support the proposed cover systems, including structural condition, load paths, connection methods, and access requirements. Structural investigations and remediation works are not anticipated unless specifically instructed. Suppliers will collaborate with the Contracting Authority and appointed designers to define interfaces with future extraction and treatment systems, though the design and delivery of extraction equipment and treatment processes are excluded from this contract scope.

Track record

Open panel. Mostly framework call-offs rather than head-to-head competition.

2 awards · 2 winners

In construction, SEVERN TRENT WATER LIMITED has awarded 2 contracts to 2 suppliers.

Who wins here

  1. FP MCCANN LIMITED1× · 50%

Across construction, the most active winners are Allerton Damp Proofing Limited, SPECIALIST COMPUTER CENTRES PLC, PORTAKABIN LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from SEVERN TRENT WATER LIMITED

4 listingsView all

Open in Construction

4 open listingsView all