Design and manufacture a high-speed isolation valve prototype that closes within 37.5 milliseconds to protect vacuum pumping systems in the STEP Prototype Powerplant.
Tender closed on 18 Sept 2026. Awaiting award.
Market sounding to assess supplier capabilities for analyzing future electricity systems, markets, and deployment opportunities for commercial fusion energy.
UK Fusion Energy seeks an engineering services partner to support Breeder Blanket development through technical expertise, project delivery, and potential supply chain integration for Stage 2A of their fusion programme.
Establish and operate a multi-purpose test facility for the STEP fusion power plant program at West Burton, managing complex first-of-a-kind test rigs and coordinating high-risk technical activities.
Procurement opportunity for a 3.5-ton excavator and transport trailer for departmental construction and excavation needs.
East Riding of Yorkshire Council is accepting bids from buyers to purchase used printing equipment on a 'sold as seen' basis.
Replacement of boiler plant and heating infrastructure at a hospital maternity and special care baby unit, with mandatory site visit required and evaluation based on 40% quality and 60% cost.
Supply and install a new double girder gantry crane system at the Mullingar Bridge Maintenance Depot including design, installation, and commissioning.