Skip to content
BidSonarBidSonar

Awarded contract

Head Office Footpath Resurfacing - Tarmac Installation

The Mining Remediation Authority requires resurfacing of damaged head office footpaths with new tarmac to replace deteriorated concrete paving and ensure employee and visitor safety.

Published 3 Jul 2026 · 4 months agoFind a Tender

View on sourceFind a Tender

Award notice and full record on the publisher's site

Closing date

Not published

No closing date published

Contract value

£30,668

Pounds sterling

Sector

Construction

Browse related listings

Location

United Kingdom

East Midlands

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-06c321

Suppliers

1 supplier

Lifecycle

Contract awarded. Originally published 4 months ago.

Awarded

3 July 2026

Awarded — no open tender advertised

Brief

The Mining Remediation Authority is seeking a qualified contractor to resurface deteriorated pedestrian footpaths at its head office site. The existing concrete paving slabs have become uneven, damaged, and broken, presenting health and safety hazards to employees and visitors. The preferred solution involves complete removal of the old paving and installation of new tarmac to create a level, durable surface that addresses underlying base issues that would cause re-paving to fail prematurely. The successful supplier will be responsible for: establishing a safe working area with appropriate signage and barriers; removing and disposing of existing concrete paving; excavating to the required depth; preparing and compacting a Type 1 sub-base; installing timber or PCC edging as needed; laying 60mm AC10 base course and 25mm asphalt topping; installing tactile paving at crossing points; installing one new gully pot; and removing all waste to leave work areas clean and safe. This project requires careful coordination to maintain pedestrian safety during construction.

Track record

Open field. No single supplier dominates the field.

5 awards · 5 winners

In construction, MINING REMEDIATION AUTHORITY has awarded 5 contracts to 5 suppliers.

Who wins here

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from MINING REMEDIATION AUTHORITY

4 listingsView all

Open in Construction

4 open listingsView all